Execute
Strategy is not the bottleneck. Nobody has a strategy problem in month eleven.
Almost no company fails because the strategy was wrong. They fail because the strategy was never converted into owned decisions on a cadence anyone maintained. The plan survives until the first busy week.
Execution is a rhythm problem. Ninety days is long enough to finish something real and short enough that drift is visible while it is still correctable.
How this goes wrong
Objectives without owners or thresholds
A goal assigned to a team is assigned to nobody. Without one name against it, a number that defines done, and a review date already in the calendar, an objective is a statement of intent that quietly expires.
Answer these honestly
- What are the three things this quarter is for, and can your team name them without checking?
- Who owns each — one name, not a team?
- What is the review cadence, and has it been cancelled in the last month?
- When something slips, how long before anyone outside that team knows?
- What did you explicitly decide not to do this quarter?
The method
Cascade to three objectives
Three per quarter, company-wide. More than three and prioritisation has been deferred to whoever is busiest.
Assign one owner each
One name, accountable, with the authority to make the calls the objective requires. Shared ownership is unowned.
Set the review rhythm
Weekly on the four numbers, monthly on progress, quarterly on the reset. The rhythm is the mechanism — cancelling it once teaches everyone it is optional.
Define escalation thresholds
The variance at which a slip stops being managed by the owner and comes to the leadership forum. Numeric, agreed in advance.
What installed looks like
- ✓Three objectives, three owners, every quarter, without exception
- ✓The weekly review happens even when it is inconvenient — especially then
- ✓Slippage surfaces within a week of occurring
- ✓The quarter ends with an honest scored review before the next one is set
The three most common mistakes
Too many objectives
Nine objectives is zero objectives with extra reporting. It guarantees the team optimises for whatever is loudest.
Cancelling the rhythm when busy
The rhythm exists for busy periods. Cancelled once, it is understood to be optional forever.
Scoring generously
A quarter scored at 100% means the objectives were too easy or the scoring was political. Both destroy the instrument.
Pillars that move with this one
Knowing the pillar is not the same as knowing it is yours.
Ninety minutes to run the diagnostic on your own numbers and leave with the binding constraint named plus the pricing architecture and the 90-day cadence that follow from it.
Save my seat — free →